If you have decided to build your own house or cottage, the topic of utilities will be among the first you will deal with. Before the actual construction process, it is essential to address the issues surrounding the land, and it is at this stage that the area of utilities is closely linked.

Utilities, also known as distribution networks, are a common concept for all overhead and underground systems, including electricity, gas, water, sewer, telecommunications, and access roads. They can be called the fundamental pillars that are an integral part of any building. Unless you are planning to build a so-called “passive house” with its own energy supply, the utilities will be essential for the realisation of your project. However, nowadays there is no need to worry as there are a number of companies that offer comprehensive services in this area. You can search for these companies under the name engineering. You may also be interested in: project for zoning decision or family houses projects.

Verification of Engineering Networks in Construction

A key element is to verify existing networks before you start construction to avoid unwanted overlaps. If you neglect this at the start of construction, you could disrupt the overall progress of the project. In addition, without approval of the utility condition, you would not even be able to obtain the necessary permits for construction. The utility administrators who operate in your region can provide answers to this question. At this step, you will have to deal with filling out applications and forms that you will send to specific distribution companies. These companies will then investigate the condition of the existing utilities in the area of your property and, if necessary, mark them on the spot with the help of a professional. It is important to note that this process is inevitable and integral, so you will need to get this sorted out in your particular district. In the Slovak Republic, there is no public network map with the distribution networks marked on it. Once you have verified the overall condition of the utilities in your region, you will be able to start considering their implementation on your property.

1. Electricity. Energy connection will be a priority at the outset of the utility solution, without which it will be impossible to proceed with construction. In Slovakia, there are several formalities associated with this. The first step is to obtain public approval for the connection from the distribution company. This process involves determining the exact number of electrical installations and an estimate of electricity consumption. It is also important to consider heating during this step. This information is sent to the distribution company together with the connection request. If the application is approved, you can be connected to the electricity grid. However, the process is still not complete. At this stage we must not forget to secure an electricity supplier.

2. Water. There are two main options when it comes to securing drinking water supplies:
– One option is to create our own well, for which a borehole in the ground is required. This option requires an initial investment in drilling, but afterwards you have a water supply without monthly payments. However, be aware of disadvantages such as well maintenance and uncertainty about the depth of the borehole, which affects the price.
– Another option is to connect to an existing water main and make a water connection. For this step you need to contact the owner or operator of the source and submit an application. Based on this application, a water connection and water supply contract will be created. It is your responsibility to construct a watertight manhole to protect the connection and ensure its maintenance.

3. Gas. What was once common is now becoming rare. As the ability to install gas in homes becomes more and more limited, different gas options are starting to become interesting alternatives for new users. When connecting gas, as with other steps, it is essential to make an application to connect to the gas network. This application is sent to the specific gas supplier. Once the contract is signed, you will be required to provide an accurate design sketch of where the gas line should run. Once approved, the gas supplier will allow you to connect to the gas network and fit a gas meter.

4. Telecommunications and data network. The first step for a prospective building owner is to determine the availability of telecommunications networks from specific providers. In some cases, you won’t have many options, as in certain areas of Slovakia the signal is only available from a limited number of providers. However, this is not such a common occurrence anymore, so you can decide according to your preferences and prices for services. Once you’ve made your final decision, installing the cables and signing the telecoms contract is the next step.

5. Sanitation. Waste disposal is another component of utilities. In many villages, sewerage is a common feature, so you will be able to connect to the existing network easily by informing the municipal authority. However, if you do not belong to this group, you will have to take care of your own waste. You can take the easier route of building a cesspit for regular waste disposal, or the more challenging option of installing a sewage treatment plant. The second option is more environmentally friendly, as you can reuse the water after it has been treated for various domestic purposes.

6. Access road. Another part of the utilities is the access road that leads to the land intended for construction. The exact parameters of this road are not defined by law. The options are varied; it may be paved, concrete, asphalt, gravel, pavement, or unpaved terrain. However, it is important to find out the legal status of this road in relation to your future house.

Do you need professional help with engineering? We consult with experts

Do you need professional help with engineering? We consult with experts

If you have little experience with utilities and consider your time more valuable than the price of utility services, we recommend you contact the experts. This service includes practical representation before the relevant authorities as well as the handling and preparation of the necessary documents.

The main benefit of this service is the saving of a lot of time that you would otherwise spend “going around the offices” and filling in a lot of forms. If you are seriously considering engineering, focus on legal firms that not only provide engineering assistance but can also handle disputes and property issues. Another option is firms specializing in utilities. The price for their services will depend on your timeframe and the complexity of the project. You won’t know the exact amount upfront because everything is handled on an individual basis.

Frequently asked Questions

01. What are utilities and why are they important to my construction project?

Engineering networks, also known as distribution networks, include systems such as electricity, gas, water, sewage, telecommunications and access roads. They are basic pillars that are an integral part of every building. Without these networks, it would be impossible to secure the necessary supplies and infrastructure for your construction project. Their presence and proper design are key to the successful implementation of the construction.

02. What steps are required to verify existing utilities for my project?

Verification of existing utilities is a key step before construction begins. This process involves contacting the utility administrators in your region and submitting a verification request. The administrators will then check the condition of the existing networks on your property and mark them on the spot with the help of an expert. This process is necessary because without approval of the state of the utilities, you would not be able to obtain a building permit.

03. How can I secure electrical, water, and gas connections for my construction project?

You must follow specific procedures and requirements for the electrical, water and gas connection of your building. For the electrical connection, you should obtain public approval from the distribution company, and you will need accurate information about the number of electrical devices and estimated consumption. For the water connection, you will need to contact the owner or operator of the water supply, where a water connection contract will be created. For a gas connection, you should submit an application for connection to the gas network, submit a project sketch of the route and supply energy on the agreed terms. Each of these steps requires cooperation with the relevant distribution companies and service providers.